Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13670782

- Product Categories
- Friendly Links
Information Name: | Seamless 3pe quote corrosion |
Published: | 2015-03-28 |
Validity: | 30 |
Specifications: | Complete |
Quantity: | 1550.00 |
Price Description: | |
Detailed Product Description: | 3pe quote corrosion seamless, seamless 3pe preservative manufacturers, seamless pipe corrosion 3pe price quote corrosion 3pe seamless, seamless 3pe preservative manufacturers, seamless pipe corrosion 3pe price quote corrosion 3pe seamless, seamless 3pe preservative manufacturers, seamless pipe corrosion 3pe price Cangzhou Guanghui provide you with the lowest prices with the best quality product quality, to facilitate customers to solve customer problems ready for use! I have a lot of plants and xian goods for your purchase, you are welcome to inquire and to plant purchase, HSBC manager promised a cooperative life-long friend, welcome friends to inquire! Feng manager on behalf of the company staff wish you new and old customers to Ram Caiyuanguangjin luck beaming TPEP corrosion steel pipe buried way:!!! Baxia pipe (see photo) from inlet section (intake), and outlet tube body consists of three parts. The inner tube can be free flow of water with a free water surface, but also full of pressurized pipe flow. Segment can be imported or sloping tower, equipped with gates and other control equipment. Common non-pressure pipe straight arched wall, constructed of concrete or Masonry; there is more pressure pipe circular reinforced concrete pipe. Imported elevation determined according to application requirements. Except for the water to generate electricity pipe, pressure pipe after pipe joint, the other uses the pipe under the dam outlet energy dissipation required to set up facilities. Pipe cross-sectional dimensions of the flow depends on the application requirements and forms: there is pressure on the pipe, according to the design flow and the downstream water level, according to the pipe flow calculations, and to ensure that there is a certain pressure over the roof pieces; for non-pressure pipe, according to the water inlet pressure before and after the paragraph, press the orifice flow calculation flow capacity, inside the water line is calculated by the constant non-uniform open channel flow equations. Wall thickness by embedding way (ditch buried on buried or corridor style), calculated and determined with reference to similar projects. To prevent temperature changes and lead to uneven settlement of foundation tube body breaks or cracks between the tube and the body to produce concentrated seepage and dam design requirements: ① tube body should be placed on good ground, and in the tube body and Set between the concrete foundation or pad Masonry; ② should not be buried on top of the dam embankment; ③ every 10 ~ 20m along the lines set expansion joints, sealing cracks located; ④ clay core wall or sloping wall and other impervious structures and pipeline junction To properly thickened, tube filling 1 ~ 2m thick impermeable soil material; ⑤ 10 ~ 20m set on the outside of the pipe every ring closure to increase seepage path along the pipe surface to prevent produce concentrated seepage. 24-hour telephone for you to open, customers are welcome to contact us. |
Admin>>>
You are the 15509 visitor
Copyright © GuangDong ICP No. 10089450, Guanghui Cangzhou Pipe Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 15509 visitor
Copyright © GuangDong ICP No. 10089450, Guanghui Cangzhou Pipe Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility