Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13670782

- Product Categories
- Friendly Links
Information Name: | Thick-walled spiral pipe corrosion epoxy powder |
Published: | 2015-03-19 |
Validity: | 30 |
Specifications: | DN100 |
Quantity: | 2460.00 |
Price Description: | |
Detailed Product Description: | Cangzhou Guanghui Industry Co., Ltd formerly state-owned units through two generations have created two additional internal and external pipeline coating production line, reaching nine pipe production lines, can be processed: 2pe / 3pe anticorrosive steel 2PP / 3PP anticorrosive steel FBE / 2FBE ring Oxygen powder cement mortar lined steel pipe corrosion coal tar epoxy anti-corrosion steel pipe drinking water, non-toxic epoxy anti-corrosion steel pipe corrosion ipn8710 polyurea corrosion epoxy anti-corrosion steel pipe anti-corrosion epoxy micaceous iron chlorinated rubber anti-corrosion steel pipe Epoxy solvent corrosion steel pipe and other products HT515 corrosion glass flake epoxy anti-corrosion steel pipe corrosion, etc., according to customer needs using a variety of materials seamless steel spiral pipe straight seam steel line pipe and so on. I. Introduction and purpose: single epoxy powder suitable for single-layer fusion bonded epoxy anticorrosion coating structure standard FBE powder coatings for a variety of corrosive media environment, oil, gas and chemical pipeline wall corrosion, as well as internal and external wall coating municipal, environmental protection, construction and other industries of metal products. Second, characteristics: fast curing, curing time is short, high coating efficiency, suitable for assembly line. Excellent mechanical and physical properties. Excellent corrosion resistance, acid, alkali, salt, oil, and water. Can play a long-lasting effect of corrosion in a wide temperature range. Coating standard SY / T0315-97 and CAN / CSA-Z245.20-98 technical requirements. Third, the basic parameters: color standard color is green, according to user request. Appearance of uniform color, no lumps. Density (25 ℃) 1.3 ~ 1.5g / cm3 GB / T4472-84 nonvolatile content of> 99.4% GB6554-86 content of the magnetic substance <0.002% GB / T2482-86 gel time (230 ℃) 230 ℃ ≤30 s 180 ℃ ≤90 s GB6554-86 curing time (230 ℃) 230 ℃ ≤1.5 min 180 ℃ ≤5 min SY / T0315-97 storage stability of <30 ℃ in a cool dry place sealed storage, guaranteed for one year. Packaging net weight 25kg, cartons lined with double polyethylene bags. Fourth, the film properties: the appearance of smooth, uniform color, no bubbles, cracks and craters visual Adhesion level 1 ~ 3 SY / T0315-97 cathodic stripping 24hr≤ 8 28d≤ 10 SY / T0315-97 chemical resistant 90d qualified SY / T0315-97 section porosity grade 1 to 4 SY / T0315-97 adhesive surface porosity grade 1 to 4 SY / T0315-97 anti-3-degree bend without cracking SY / T0315-97 no impact strength -30 ℃ 1.5J Pinhole 25 ℃ ≥18J SY / T0315-97 breakdown strength ≥30MV / M GB / T1048-1989 volume resistivity ≥1.0x1013 GB1410-1989 wear ≥3L / um SY / T0315-97 five, Construction Description: Tu installation method: 40 ~ 120KV high voltage electrostatic spraying. Recommend Thickness: ordinary level 300 ~ 400um, to strengthen the level 400 ~ 500um. Theoretical amount: ordinary level 0.42 ~ 0.56 kg / m2 to strengthen the level 0.56 ~ 0.70 kg / m2 Surface treatment: sand or shot blasting more than Sa2.5 level, anchor pattern depth of 50 ~ 80um. Preheat the workpiece: general use frequency heating, the workpiece temperature controlled within the range of 220 ℃ ~ 240 ℃, should not exceed 260 ℃. Spray: Adjust the spray gun and the workpiece, the coating reaches a specified thickness. Quenching time: 230 ℃, the time from spraying to quench coating of not less than 90 s cooling: cooling down to below 95 ℃, surface inspection. Repair leak point: after the leak is detected, roughened, and the use of our heavy-duty liquid epoxy coating SLH07 repair. The powder coating product is applied on top of the preheating of the workpiece, the use of waste heat curing, generally does not require post-baking. But in the wall is too thin piece outside temperature is too low or the need to consider additional heat curing. Six, storage instructions: Closed stored below 30 ℃, 65% relative humidity, can be guaranteed for one year. Proposal at a lower temperature and humidity storage conditions, the temperature exceeds 35 ℃ cooling measures should be taken. After using the remaining portion must be re-packaged to prevent moisture absorption. Storage and transport should be away from fire and heat source to prevent the sun and rain. Seven security matters: This product non-toxic, non-polluting, non-flammable, but still need to take measures to prevent the construction process large number of human inhalation. Be careful using this product before use and safety precautions when handling. Furthermore, it should follow the safety regulations of the State or local government regulations |
Admin>>>
You are the 15509 visitor
Copyright © GuangDong ICP No. 10089450, Guanghui Cangzhou Pipe Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 15509 visitor
Copyright © GuangDong ICP No. 10089450, Guanghui Cangzhou Pipe Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility